Dubai · United Arab EmiratesPhysical commodities · Import & export · Wholesale solutions

Infrastructure & Marine Materials

Drainage Aggregates

Institutional bulk sourcing profile for Drainage Aggregates, structured around certified specifications, project tonnage and GCC delivery requirements.

Drainage Aggregates
Illustrative product image; contractual specification governs.

Technical & chemical specifications

Procurement specification grid

The values below are procurement reference points. The signed specification, producer certificate and approved laboratory results govern each order.

Technical procurement data
ParameterSpecification / Commercial Basis
Material ClassFree-draining aggregate
Gradation / Weight RangeCommonly 10–20, 20–40 or project drainage grading
Reference StandardsEN 13242; ASTM C33 where applicable; drainage design specification
Specific Gravity2.55–3.00 source-specific
Water AbsorptionLow absorption / durable rock preferred; project limit governs
Soundness / DurabilityASTM C88 / EN 1367-2 where specified
Port Logistics / Quarry CapacityConfirmed against nominated quarry, crusher, trucking fleet and port slot; monthly tonnage stated in firm project offer.
Delivery BasisEx-quarry / delivered site / FOB / CFR / CIF as applicable to material, route and project logistics.

Industrial & engineering applications

Application context for institutional procurement

Drainage Aggregates is used in heavy civil and marine procurement where subsoil drainage, French drains, retaining-wall drainage, permeable layers and infrastructure drainage systems. Institutional buyers should define the material class, gradation or weight range, geological source, density or specific-gravity requirement, water-absorption limit, durability testing, total project quantity and delivery sequence before issuing an RFQ. GCC infrastructure programmes frequently require engineered core rock for port breakwater protection, graded armourstone for wave loading, certified road-base aggregates for highways, or controlled fill and drainage materials for major civil platforms. AL BASAM coordinates sourcing against the project specification, nominated quarry and laboratory test regime, while also assessing loading method, trucking cycle, stockpile control, port handling and monthly supply capacity. For marine and quarry materials, commercial feasibility depends on both compliance and logistics: a technically suitable source must also meet vessel, berth, laycan and discharge requirements. Final acceptance is subject to approved samples, third-party or project laboratory reports, signed contractual specifications and the agreed inspection plan.

Quality compliance & documentation

Institutional transaction document package

The contracted document set is confirmed in the offer and may include the following, subject to product, origin, destination and buyer requirements:

Transactional B2B RFQ

Request a bulk quote for Drainage Aggregates

Submit the technical grade, total volume and destination details required for an institutional sourcing review.

Final availability, specification, origin, price and delivery remain subject to a formal commercial offer and due diligence.

Important

Technical values are procurement guidance only. The signed contract, approved specification, producer/quarry certificate and agreed inspection documents govern acceptance.